RAW CASHEW NUTS (Outturn 53)
Availability: | In Stock 1000 Items |
---|---|
UPC: | 08013100 |
Seller Information
Seller: | NIMOL CORPORATION DMCC |
---|---|
Seller Type: | Premium |
Seller Country: | United Arab Emirates |
Lead Time: | 60 Days |
Packing: | Jute Bags |
Unit of Measurement: | Metric Tons |
Weight/Unit: | 1,000.00 Kg |
Minimum order size: | 1.00 Metric Tons |
Payment Methods
- Bank Transfer
Credit Terms
- Full Payment
- Partial payment 20% upon order confirmation can be paid by card, 80% on Dispatch, % upon delivery
RAW CASHEW NUTS
PACKAGING: SOLD AND DELIVERED IN JUTE BAGS (PP BAGS)
SOURCING FROM: BENIN, TOGO, IVORY VOAST, TANZANIA, GUINEA BSSAU, NIGERIA
Please ask for a quote.
PAYMENT TERMS
1) 100% ADVANCE PAYMENT
2) 20% ADVANCE PAYMENT AND 80% ONCE CARGO IS SHIPPED AGAINST COPY DOCUMENTS
3) LC METHOD
COSTS DOES NOT INCLUDE SHIPPING OR IMPORT TAXES. PLEASE SELECT SHIPPING QUOTE UPON CHECK OUT FOR A COMPREHENSIVE PRICING
OUTTURN 54
Download Material
- 1. Any Import duty, taxes, surcharge, levy etc., present or future, as per regulations of
- importing country shall be to Buyer’s account.
- 2. Seller to submit the shipping documents as follows: 3 2 Commercial Invoice, 3/3 Original
- Bill of Lading, 1 2 LDC Certificate of Origin, 3 2 Packing List, 1 2 Phytosanitary Certificate,
- 1 2 Fumigation Certificate, 1 2 Weight and Quality Certificate, Non GMO Certificate (part of
- Quality Certificate)
- 3. If the material is not cleared within 15 days of arrival of cargo/ documents whichever is
- later, the shipper holds the right to consider the contracted quality as landed quality and
- B/L weight as landed weight.
- 4. Risk of the material is transferred to buyer upon loading of material at port of loading and
- the ownership of the material is transferred to buyer upon full payment of sale value to the
- seller.
- 5. Contract signed & exchanged per fax or e-mail to serve for the purpose of originals and
- holds full legal value in all respect unless followed by the originals.
- 6. The buyers shall provide at the request of seller a No Objection Certificate (NOC) to
- transfer the cargo to any other buyer without any claims in case the buyer defaults to clear
- the cargo before filling of the IGM by the shipping line. This document is only for clearance
- in case of default.
- 7. Weight difference up to 0.5% at the discharge port is acceptable as per International
- Standards.
- 8. Tolerance of /- 10% is allowed for both quantity and value.
- 9. The goods shall be inspected prior to shipment by any independent surveyor at the load
- port at seller’s cost who shall issue a Certificate of Approval to load the goods specifying the
- actual quantity and quality and this will be final at load port and binding on both parties.